Nutrient Separating Baffle BoxTM
EASE OF INSTALLATION
|
Interior components are assembled prior to delivery to the job site so the Nutrient Separating Baffle BoxTM can be installed with minimal effort.
The screen system includes a wide range of positional adjustments so that it can be quickly and easily adjusted at the job site if necessary.
All structures are load rated for at least H-20. Standard wall construction of the structure is 6" thick steel re-enforced concrete. Concrete wall thickness can be thicker upon request.
Because it is not necessary to duct off line for treatment, head loss is minimal and comparable to a large square catchbasin. Because of this, existing stormwater systems can be retrofitted with a Nutrient Separating Baffle BoxTM in line with existing pipe without compromising the original watershed design.
|
|
|
|
Sample Installation Photos
|
|
|
(click on pictures to enlarge)
| Orlando, FL
Model NSBB-6-12-100 with risers and hatches for access at finished grade
|
|
Set Bottom Half of Structure
|
Set Upper Half
|
Set Risers and Hatches
|
Ready for Pipe and Backfill
|
 |
 |
 |
 |
|
|
Seminole County, FL
Model NSBB-8-14-115 treating a 42" pipe. Screen system has additional screened lid to prevent floatables from escaping during extreme flow conditions. |
|
Set Bottom Half in Place
|
Set Riser Section
|
Set Slab Top with Hatches
|
Complete with Easy Access
|
 |
 |
 |
 |
|
|